Build

Build

From shell to acoustic fit-out to gear in the racks. Construction planned to commence in 2027. Phases 03–04 · Queued

10

Build the shell

The structure everything else depends on.

  • Double walls & floating floors
  • Ceiling & floor isolation
  • HVAC, plumbing and wiring to spec
11

Acoustic isolation

Keeping sound in — and the world out.

  • Floating rooms (room-within-room)
  • Sealed solid-core doors, double entry
  • Double / triple-glazed studio windows
12

Interior finishing

Where it starts to look — and sound — like a studio.

  • Acoustic panels & treatment installed
  • Cable conduits & access points
  • Non-parallel walls where possible
  • Soundproof doors & windows fitted
13

Equipment & integration

Gear procurement and wiring it all together. See the Gear Locker →

  • Studio gear procurement
  • Furniture & ergonomics
  • Software & licensing
  • Patchbay, tie lines & wiring