From shell to acoustic fit-out to gear in the racks. Construction planned to commence in 2027. Phases 03–04 · Queued
10
Build the shell
The structure everything else depends on.
- Double walls & floating floors
- Ceiling & floor isolation
- HVAC, plumbing and wiring to spec
11
Acoustic isolation
Keeping sound in — and the world out.
- Floating rooms (room-within-room)
- Sealed solid-core doors, double entry
- Double / triple-glazed studio windows
12
Interior finishing
Where it starts to look — and sound — like a studio.
- Acoustic panels & treatment installed
- Cable conduits & access points
- Non-parallel walls where possible
- Soundproof doors & windows fitted
13
Equipment & integration
Gear procurement and wiring it all together. See the Gear Locker →
- Studio gear procurement
- Furniture & ergonomics
- Software & licensing
- Patchbay, tie lines & wiring